SP60P-M/MU/L : 3.1 kVA (Vacuum pump included: 3.6 kVA)
3. This transformer can transform a voltage to the following levels.
.
SP80V-M, SP60P-M
: 220/200 V (M does not support the combination of 220 VAC and 50 Hz.)
.
SP80V-MU/L, SP60P-MU/L
: 1. 480 V 2. 420V 3. 400V 4. 380 V 5. 220 V 6.200 V
The label below shows the voltage to be supplied to the machine main body.
If changing the power supply voltage, replace the supply voltage label with a new one.
Email:smt@smtsky.com,Website:www.smtsky.com
Email:smt@smtsky.com,Website:www.smtsky.com
In that case, align the value on the supply voltage label with ▼ according to the power supply
voltage.
.
Remaining adhesives should be wiped off the surface clean with alcohol etc.
1E3C-E-IMB01-A01-02
4. Set the polarity according to the rotating direction of the blower motor.
. Actuate the blower to ensure that air is exhausted from the vent.
5. If air is not exhausted from the vent, interchange the locations of L1 and L3 of TB1.
Page 1-4 1E3C-E-IMB01-A01-02 1.1 Preparations for Installation
B) Main power wiring and terminal connection In installation, perform wiring and connection following the steps below.
Email:smt@smtsky.com,Website:www.smtsky.com
Email:smt@smtsky.com,Website:www.smtsky.com
. For SP80V-M and SP60P-M
1. Remove the left side cover c of this machine.
. The side cover is secured by eight bolts.
2. Pass the cable through the cable clamp
d.
. The recommended outside dimension of the cable is 13.5 mm to 18.0 mm.
. If it is hard to pass the cable through the cable clamp d, loosen it by rotating it counterclockwise.
To the next page
1E3C-E-IMB01-A01-02 Page 1-5 1.1 Preparations for Installation
3. Connect the cable with the main power terminal block, using a driver.
Email:smt@smtsky.com,Website:www.smtsky.com
Email:smt@smtsky.com,Website:www.smtsky.com
.
Recommended connecting terminal
.
SP80V-M, SP60P-M Manufacturer : J.S.T. Mfg. Co., Ltd. Type :FK5-5.5
.
SP80V-MU/L, SP60P-MU/L
N510027849AA
Page 1-6 1E3C-E-IMB01-A01-02
. For SP80V-MU/L and SP60P-MU/L
1.1 Preparations for Installation
Email:smt@smtsky.com,Website:www.smtsky.com
Email:smt@smtsky.com,Website:www.smtsky.com
1. Remove the left side cover c of this machine.
. The side cover is secured by eight bolts.
2
Using cable ties, tie the cable at the locations e and f.
3
Secure the cable by rotating the cable clamp d clockwise.
. At this time, be sure to pull it at 100N to make sure that it is securely fixed.
[4-pole type]
To the next page
1E3C-E-IMB01-A01-02 Page 1-7 1.1 Preparations for Installation
Email:smt@smtsky.com,Website:www.smtsky.com
Email:smt@smtsky.com,Website:www.smtsky.com